Study

Partners: Shell KPMG PHILIPS ATS
Partners: AkzoNobel Tata Steel Deerns Tebodin
Partners: Deloitte SABIC SCA Alliander
Partners: ENGIE Ridder Data Systems Abbott Ardagh Group
Partners: FrieslandCampina Grolsch

Zernikeborg

In the next few years a lot will be changing at Nijenborgh 4.
The current Nijenborgh 4 complex is no longer sufficient and will be replaced by a new building, called Zernikeborg. Construction work on the long-term project at the Zernike Campus Groningen will continue in 2018. After the Bernoulliborg and Linnaeusborg buildings, the Zernikeborg will be the third new building for the Faculty of Mathematics and Natural Sciences.

The new building will be one of the largest construction projects in the Netherlands and will house some 1400 students and 850 staff members. Alongside offices and teaching rooms, the building will also house a wide range of specialized laboratories, including physics, chemistry and low-vibration labs. 

A 3D Impression of the final design can be found here.

Some pictures are shown beneath:

Zernikeborg